Is Synagro's new application to locate a biosolids crap bakery in Plainfield Township a "done deal" because it is a permitted use? Absolutely not.

Synagro emailed a press release to a couple of local reporters on Friday afternoon March 31 at about 3:30pm.  At this very same time, a new site plan was dropped off at Plainfield Township by a Synagro representative.  Perhaps the press release was emailed by this person as he departed the municipal building.  The press release stated that Synagro worked hard to relocate its plant in the Solid Waste zoning district, where it is a permitted use.  Of great interest to this observer is that this press release still has not been posted on Synagro's website - not in the general area for press releases or the page for this project.  They may have worked hard, but they didn't work smart.  You will marvel at how they squashed their plant into a slice of land too small for even a house, and a waste water treatment plant on one of the only small areas not fully containing steep slopes at the southern boundary.  Perhaps not being proud of the result explains why this new plan is not advertised on Synagro's website.  And perhaps there is a more sinister explanation.
"I heard Synagro filed an application for a building permit.  Does this mean they are "in" and will start building soon?  Preposterous.  One Plainfield Township procedure that initiates a Site Plan review is to file a form titled "Building Permit Application," which results in a Zoning Officer response.  Synagro didn't do this for its first application - it chose to try to slam its Site Plan through by filing on the deadline and simply showing up and attempting to get planning commission approval in one night. They did this time however - and it may be that they were hoping for what is called "deemed approval" if the zoning officer fails to respond in 15 days.  The first thing that happens if your use requires a Site Plan approved is the zoning officer responds with a rejection letter indicating he can't issue you a permit..  A building permit isn't even in the picture until the Site Plan is approved.  If Synagro were to ever obtain approval from Plainfield, they then would have to get permits from DEP and Delaware River Basin Commission (DRBC) and a building permit.  Nobody's building as much as a tree fort any time soon.
This is a portion of the form Synagro filed - this will generate a denial of building permit
letter from the Zoning Officer and cause the Site Plan to be put on the schedule for review

Here is an artist's depiction that includes both the initial site as well as the new one.  The first site required two use variances - one for multiple uses and one for a non-permitted use, and a third variance (dimensional) because the area proposed is less than required.  Note that the two sites are adjacent to each other, and are separated by an old railroad bed (yellow area) that is owned by Plainfield Township. The railroad bed divides the Commercial Industrial and Solid Waste zoning districts in Plainfield Township.

Artist's rendering of Synagro's two crappy proposals

Location relative to zoning districts and tax parcels

Below is one sheet of Synagro's new site plan, and it depicts a proposed berm that will keep cars, trucks, storm water runoff and such from falling into the Doney Quarry #2.  You can't tell in this particular diagram, but the parking lot for employees is located on a slope of over 70%. We'll see that later.

Sheet 2 of Synagro's March 31, 2017 Site Plan, with overlay of usable/unusable portions of proposed site

The zoning ordinance requires a five (5) acre lot for Synagro's use.  Note that only about 1.65 acres of 7.01 acres is accessible and/or usable in the proposed plan, and as a result Synagro's trucks will be taking a novel route across a new proposed footprint of the existing energy center property for loading and unloading.  Jesus H. C. (my dad's favorite expression RIP) - you can't even park one of Synagro's trucks on this postage stamp without blocking employees or other trucks from coming/going.  How do you wash a truck after it dumps its "load"?  While unloading, trucks will be sitting within the rear yard setback, as well as maneuvering back and forth on the neighbor's property.

This plan will require multiple variances in this observer's opinion - both use and dimensional variances.  Just because you are a permitted use does not mean you can waltz in the door slinging crap around some big shit shot.  The need for these variances will be detailed in a post tomorrow.  Simpy put, this plan is a pile of crap befitting transport in one of Synagro's sludge trucks - which if you look closely are depicted in the picture at the top.  This is fairly clear from just the diagrams above, without going into further analysis.  Your BS alarm should be sounding before cracking the ordinance open - mine did.  Pardon me sir, would you like a vomit bag while you browse?

Plainfield Township is to be returned use of its property after the landfill closes per a legally recorded agreement - something Synagro representative Jim Hecht recently stated he is unaware of.  Did Waste Management tell Synagro about the agreement?  More importantly, why didn't Waste Management approach Plainfield Township to discuss the agreement prior to allowing Synagro to pursue the new plan - which unlike the first plan requires use of township property that Waste Management (Grand Central) has committed to relinquish?  Mr. Hecht said Synagro plans to run its plant for long after the landfill's anticipated closure in roughly 2035, depending on the rate of disposal.  That may create a wrinkle, since the new plan would require continued use of Plainfield's property... more to follow.

Synagro is going nowhere with either of their site plans.  The new one is a Hail Mary Queen of Craps.  How a professional engineer could send the latest doo-doo out the door is beyond belief.  Perhaps Synagro believes that the groundswell of support from the community (which thus far consists of Wind Gap council remaining oddly silent, and Pen Argyl and Plainfield essentially voting against the proposal) will give planners and zoners cause to approve this "plan".  Luckily Plainfield Township has committed to fighting this project by hiring their Solicitor and as many experts as needed.  Plan C will likely be Plan A - after Plan B is exposed as being dung, Synagro may attempt to pursue the site where they are not a permitted use and where they really want to be.  And that will be fun if that is their plan.  Why Syngaro has not walked away from this project has a lot of people scratching their heads.  And Green Knight hasn't said what it is getting out of this deal that as a non-profit they should be returning to the communities of the Pen Argyl Area School District.  Green Knights' donations have dropped and it isn't clear what if anything they will be distributing to the communities in the future.

Why hasn't Wind Gap council joined Pen Argyl in objecting to Synagro's 400 ton per day biosolids crap bakery proposed for Plainfield Twp?

Synagro proposed it's crap bakery at the November 21, 2016 Plainfield Township Planning Commission meeting.  A few weeks later at its December meeting, the Plainfield Board of Supervisors voted to hire a solicitor and expert(s) to testify at an anticipated zoning hearing associated with Synagro's application.  In essence, Plainfield Township opposes the sludge plant without explicitly saying so - which it can't do.  Taking a pro or con stance would open the township to litigation and corrupt the review process.  The supervisors and town manager must appear to the public to be unbiased.

On the other hand, neighboring municipalities Wind Gap and Pen Argyl, each of which border the proposed sites (there are currently two, within a few hundred feet of each other) can take a stance.  Pen Argyl has done so - Mayor Mikal Sabatine and borough council wrote a letter dated March 1 addressed to the Plainfield Township Planning Commission in March, objecting to the project.
"[Our] primary concerns are, but not limited to, traffic from vehicles passing through the borough, odors, pollution, the impact to public health and quality of life"
The borough stated that it opposes the plant due to its effect on the borough and residents, as the proposed site is very close to the borough's boundary and residents' homes.
Pen Argyl Letter to Plainfield Township Planning Commission opposing granting Synagro biosolids a variance by Dick on Scribd


OK, Plainfield Township and Pen Argyl oppose Synagro's plan.  WTF is Wind Gap?

This blogger's question is where the hell is Wind Gap's letter?  Are they reluctant to express an opinion because Green Knight is currently pursuing a boondoggle to redevelop the Howard Beers property spanning Wind Gap, Plainfield and Bushkill Twp???   This project has more problems than Iraq.  Just recently, Wind Gap became aware of all the corners Green Knight is attempting to cut on this project, as its engineer wrote a lengthy letter addressing deficiencies.  Plainfield's consultants have as well.  Objectors to Green Knight's inexplicable continued support of Synagro would be well advised and served to attend the April 17 Plainfield Township Planning Commission meeting, where this abortion will receive the next in a series of reviews because of Green Knight's nonstop rejection of satisfying standards and unending requests for waivers.  You will see Green Knight member Peter Albanese in action and get a better flavor of the half-assed manner in which Green Knight operates.

Back to Wind Gap.  Your residents need to pressure your council into standing up for you, your quality of life, and your health and well being, and explicitly object to this project - if they have not already done so.  Pen Argyl and Plainfield Township have put their markers down, both on red - get the hell out of town Synagro.  Wind Gap can not stand idly be and remain silent.  And while you are addressing them, ask them if Green Knight has demonstrated in its handling of the proposed project on the Beers property that it is the kind of economic development partner Wind Gap deserves.  You simply must attend the April 17 Plainfield meeting, to see how Green Knight operates.  It is likely Synagro delayed to May's meeting so as not to be associated with the fallout of the Green Knight/Beers project.


Wednesday, April 5, 2017

Synagro announces it plans to operate Plainfield Township / Wind Gap / Pen Argyl biosolids sludge plant 24 hours a day, seven days a week

Hidey ho, neighbor - Pull up a chair and let's talk about shit

Tonight at the Plainfield Township Fire Hall Synagro hosted what was advertised as a "Q & A session".  Attendence was moderate but not overwhelming.  Synagro provided a panel of what apparently was at least half made up of employees, including project manager Jim Hecht.  There was one paid consultant.  In the audience were two representatives of Waste Management, including John Hambrose.  Carlton Snyder and Robert Cornman Jr of Green Knight were in attendance. Questions had to be submitted on index cards, avoiding what would have been a zoo. To Synagro's credit, most of the questions that were submitted appeared to be at least read out loud. Some answers were non-responsive.

This blogger was honestly not interested or concerned with hearing about the science of crap.  We know it smells, we know there will be fifty 20+ ton trucks a day arriving at and departing this facility, adding to the already overburdened Wind Gap and Pen Argyl corridor, and we know there is a hell of a lot of readily available farmland to spread it on. The intent of the panel seemed to be primarily to talk about the science of crap, so this blogger had to wait for the good stuff that was in between the lengthy orations about how shit is so great, the distinction between shit in the garden versus shit in the crapper, etc etc

A few highlights:
  • Synagro plans to operate 24/7 and process 400 tons of crap a day
  • Synagro plans one product only - Granulite.  Representative Hecht said this is primarily a "wholesale product".
  • There is a contract in place for Green Knight to receive payment from Synagro for waste energy, but neither Mr. Hecht or Mr. Snyder could say how much this crappy operation would benefit Green Knight per month ($$$) and in turn possibly local citizens if Green Knight chooses to pass some green on to benefit the community.
  • One question was how can Green Knight call itself a non profit, when in 2015 it had $3.8m in the bank, had revenues of over $1.8m, and distributed a paltry $20,000 to the community.   Excellent question and neither Mr. Snyder or Mr. Cornman stepped forward to answer it.  This blogger found out from The Foundation Center, a well known database of non profits, that they do not list Green Knight Economic Development Corporation in their "grant maker" database because they do not believe GKEDC's level of grant making is consistent with its net income. GKEDC is listed in the online free version of Foundation Center, but not the Professional version. Basically they list it as a non-profit, but do not believe it deserves to be one is what a representative stated after the technical team investigated the listing discrepancy.
  • Synagro is pursuing both its original Site Plan for the CI district, currently tabled, as well as its new site plan submitted March 31, 2017 to see which one "sticks" (this blogger's term).
  • Synagro claims it will not produce odors greater than those already present in the area.  Think about this folks - if this plant goes in, complaints about odors will result in Synagro and Waste Management pointing fingers at each other.  And..after the land fill closes,  Synagro will no longer have WM to hide behind.
  • There is a an agreement in place for Waste Management to return use of the Plainfield Township Recreational Trail to the township after the land fill closes - and the trail will be used by Synagro's trucks in the latest site plan filed.  Mr. Hecht said he is unaware of this agreement, but that "Synagro will not cease use of its plant after the landfill closes."  (Synagro will shift to natural gas for heat after the land fill stops producing the gas that the energy center turns into electricity and heat).
  • Jim Hecht reported that Synagro was approached by either Waste Management or Green Knight to pursue this project about 1.5 years ago, but he could not remember which.
  • Mr. Snyder's recollection after the meeting is that Waste Management brought the project to Green Knight after Synagro was already involved.
  • Mr. Hecht could not name one organization, such as the Chamber of Commerce, that supports this proposed plant.  He garnered several catcalls from the audience when he added that Synangro has been busy on its plans and not reaching out to the community.  You just could not make this shit up, people.
  • A few panel members insisted on not only answering a question that was asked, but droning on for minutes afterwards about why this project is good in theory - totally unrelated to the question asked.  They spoke as though they live in a bubble, totally unaware that community members have minds of their own and uniformly are in opposition to this project.

Observations

Snyagro is known to give Granulite away for free to whomever will take it.  With the tremendous amount of farmland in the area, think of the incentive for farmers to use a free fertilizer instead of paying for one.  How can Synagro afford to do this?  They get paid up front $85 to $120 a ton to haul this crap away as class B biosolids.  Getting paid for your raw product - not bad, eh?  Granulite could be coming to the farm next to your house soon.  Back er up!

Mr. Hambrose and Mr. Snyder entertained questions from audience members following the meeting, and this blogger observed that they both feel this project is the best thing since sliced bread, and are unphased (ie tone deaf) by the unified objections of the community, and total lack of support.

There most certainly is an agreement between Grand Central (Waste Management) to return use of land Synagro plans to drive trucks over, and which Plainfield Township owns, to the township when the land fill closes.  This will be a wrinkle since Mr. Hecht implied Synagro plans for the proposed plant to remain in operation for many years after the land fill closes:

Easement Agreement- Plainfield Township Recreation Trail- Grand Central-03.11.1997 by Dick on Scribd


Synagro's new Site Plan

We'll take a close look at the Site Plan later, and for now it will simply be posted without comment.  It is currently in the pipeline to be reviewed by the Zoning Officer and Township Engineer in preparation for the May 15 Planning Commission meeting.

Sunday, March 5, 2017

West Penn residents appeal zoning permit for agricultural water extraction that Jay Land's Ringgold Acquisition Group II LLC is attempting to convert to commercial use

West Penn residents have filed an appeal to have this permit for "water harvesting" revoked
A hearing before the West Penn Zoning Hearing Board has not yet been scheduled

Background
In January 2015, Jay Land's Ringgold Acquisition Group II LLC was granted a permit to locate what the West Penn Township zoning officer called a "Water Harvesting" use on the leased Knoedler property on Fort Franklin Road.  Land stated multiple times that his use was agricultural only, and for delivery to lands he personally owned or leased.  He estimated at one point that he was not taking more than 1000 gallons a day.  There is no such use of "water extraction" in the West Penn zoning ordinance for the site in question.

Meanwhile, two miles away, Land's MC Resource Pine Valley Springs operation on the leased Hower property is embroiled in a lawsuit with the DEP, being heard before the PA Environmental Hearing Board.  The issues are DEP suspended Land's permit because he is running a commercial water extraction operation and not fulfilling the terms of the permit - he is not monitoring bypass flow to ensure a spring maintains minimum flow, and he is not treating the water extracted with UV light as required.  If he treats the water, then he has to maintain records which has an expense, and he can be held accountable if the metrics aren't met.  To put it succinctly, Land is trying to operate the Pine Valley operation without satisfying DEP permitting requirements.  His appeal before the Environmental Hearing Board is grinding along, and it has become common knowledge that once the Pine Valley lease expires (in the next year), Land intends to shift production to the Fort Franklin location.  He's biding his time at Pine Valley to run out the clock, but the resolution of the issues at Pine Valley may affect future Fort Franklin operations.  If you read the docket (linked to above) unfortunately you will find the DEP is dragging its ass, and Land has been having his way with them for years.  It is not dissimilar to the circle-jerk with the West Penn Supervisors, as will be seen below.  Land has gotten his way until now, and apparently only legal action by concerned citizens will stop him because West Penn Supervisors are doing anything and everything to be deaf, dumb and blind.  More about that is below as well.  Let's get the party started.

Increase in activities at Fort Franklin in October 2016, destruction of guardrail and reckless and dangerous tanker movements
Back at Fort Franklin, Land is up to his usual tricks.  In October 2016, he quickly ramped up production to approximately 100,000 gallons of water extracted daily - and remember this water is allegedly being used for irrigation.  This is a magic number, because at over 100,000 gallons, additional DRBC (Delaware River Basin Commission) and DEP permits and regulations kick in.  Land's ultimate production is planned to be over 500,000 gallons a day.  Now, Land never met the requirements of the January 2015 water harvesting permit he was issued, and received a violation notice in March 2015 that he had not filed a land development plan.  He did not respond to this notice and today has still not filed one.

50-ton tanker that requires special permitting from both PADOT and West Penn Township (but has neither) loading at Fort Franklin site in October 2016.  A 2015 Road Study found that the road from this site should be posted at 15 tons, and will require improvements to even withstand that loading.

Truck traffic associated with the October increase in activity at Fort Franklin was disruptive and extremely dangerous to residents along the route, and furthermore the extraction of 100,000 gallons of water daily was associated with at least one nearby resident's well water turning brown and becoming laden with sediment.  When the trucks leaving the Fort Franklin site make the turn from Blue Mountain Drive onto Route 309 South, they engage in extremely reckless and unsafe maneuvers which involve crossing the center line of Blue Mountain Drive, crossing the center line of Route 309 and both lanes of oncoming 50 mph traffic, or both.  Some of the tankers leaving the Fort Franklin site in October and November were 50-ton units, which require a permit from both the state of Pennsylvania and West Penn; these tankers are believed to have neither.  The guardrail along Blue Mountain Drive at Route 309 was destroyed by water tankers making the turn too tightly.  It was hit at least three times from October through November 2016.  West Penn supervisors have not and will not discuss why they have not issued a cease and desist order to Land for the Fort Franklin operation.

Guardrail destroyed by water tanker at Blue Mountain Dr/Rt 309 intersection in October 2016 making extremely dangerous and reckless turn onto Route 309.  All lanes of traffic in both directions on Route 309 must be blocked to make this turn with a slowly moving water tanker, starting from a stop.  What could go wrong?

Residents' legal actions against Jay Land's operations begin piling up
On January 13, 2016, a group of West Penn residents filed a lawsuit in the Philadelphia Court of Common Pleas against Jay Land, MC Resource Development Company, Pine Valley landowner Larry Hower, Hower's company Snow Green Acres, Ringgold Acquisition Group II LLC and Fort Franklin landowner David Knoedler, arguing nuisance and negligence due to truck traffic, degradation of wells, etc.  In September 2016, Hower filed a cross-claim against MC Resource, confirming that Mr. Hower and Mr. Land's futures in cahoots is short-lived.

On August 29 2016, residents preserved their right to file a lawsuit against West Penn Township in relation to Land's water extraction operations by filing a Writ of Summons against WPT in the Schuykill County Court of Common Pleas. To date, the residents have not exercised the right preserved by the Writ.

West Penn residents put township on notice on August 29, 2016 that they intend to sue its ass over inaction on water extraction

Land's Fort Franklin site supplies Niagra Bottling non-permitted sediment-laden water for one month, causing failure of Niagra's filtration equipment and pollution of resident's water
From mid-October to mid-November approximately fifteen 40 to 50 ton tankers daily traveled from Fort Franklin to Niagra Bottling.  A bottler is supposed to accept untreated (raw) water only if the bottler owns the extraction operation.  Niagra does not.  It is rumored that Land's non-permitted and unregulated raw water fouled Niagra filters and caused $30,000 of damage.  Resident Jim Hehn near the Fort Franklin site reported his water went from clean to brown and heavily laden with sediment.  Production at Fort Franklin was suspended.  In November, Land had two new wells drilled at Fort Franklin - he's trying to get deep enough to get clean water.  Not "spring water", mind you - that is closer to the surface.

West Penn Supervisors fail to act on Bonding and Posting of roads to protect township residents health, safety and welfare
In November 2015 the West Penn Supervisors received the results of a study of the roads Jay Land's operations are and were anticipated to use, including Blue Mountain Drive.  The study found that Blue Mountain Drive (and other roads) should be posted with a 15-ton maximum gross weight limit, and that even at this limit Blue Mountain Drive requires upgrading to a thicker surface. This would preclude the 40 to 50 ton tankers that Land uses.  The supervisors then proceeded to ignore the results of this study.  Under pressure from residents to get off their asses (legal pressure through lawsuits - the only kind these look-the-other-way do-nothings appear to understand), a workshop on Bonding and Posting is scheduled in West Penn Township on March 27, 2017 from 8am to 12pm.

West Penn Supervisors fail to file cease and desist order for violation of Land's permit requirements
The letter below was sent multiple times to Ringgold Acquisition Group II LLC, to notify them that the lack of filing a Land Development Plan was in violation of the January 2015 permit.  However, a cease and desist was never filed.  What part of "not doing your jobs" do you not understand, supervisors?  For whom are you working?

 Zoning Officer Anders, the same genius who issued the Jan 2015 use permit for a non-listed use
filed this notice of violation on March 18, 2015, as well as followup letters.  They were not responded to, and no further action has been taken by West Penn Township.  Fail.

Residents stage protests against water extraction
West Penn residents want action, not willful ignorance

West Penn residents staged peaceful protests against water extraction on January 3, 2017 and on February 6, 2017.  Each of these protests was held prior to a Board of Supervisors meeting.  West Penn Supervisors have dragged their feet, giving residents virtually no support at all.  This blogger heard a recording of Supervisor James Dean on July 2, 2016 stating that the West Penn Zoning Officer was drafting a cease and desist order for Land's Fort Franklin operation due to failure to file a Land Development Plan.  Rest assured we're doing all we can to protect our citizens health, and safety and welfare.  Bull shit, Mr. Dean.  The cease and desist was never filed.  Talk and no action - disgraceful.  How much is it worth for supervisors to ignore their residents' health, safety and welfare on behalf of one unscrupulous operator?

Appeal of January 2015 permit for "water harvesting" - hearing date TBD
On February 28, 2017, West Penn residents filed an appeal with the West Penn Zoning Hearing Board, demanding that the permit for "water harvesting" issued to Ringgold Acquisition Group II LLC be revoked.  Their argument is:
  • The permit was issued in error, because "water harvesting" is not a use in the zoning district(s) where the Fort Franklin site is located.
  • The permit expired on January 17, 2017, because multiple requirements associated with the permit were not completed/satisfied.

West Penn residents appeal of water extraction permit issued using argument that water extraction is similar to an agricultural use

The legal opinion referenced in the residents' appeal is below.  It is significant, in that the Commonwealth Court found that water extraction is a more intense use than agriculture, and more similar to mineral extraction.  West Penn's Zoning Officer, its solicitor and certain BOS members have stated water extraction is similar to an agricultural use.


Commonwealth Court finds that bulk loading of water is not similar to an agricultural use
It is more similar to a mining operation in intensity (see Page 10)


Protest scheduled for March 6, 2017 from 6:30pm to 7:30pm @ WPT Municipal Building
prior to regular Board of Supervisors meeting

Tuesday, February 21, 2017

Former Eldred Township Zoning Officer who botched Nestle Waters application review and cost residents $90K rumored to run for Supervisor

In Eldred Township, Nestle Waters submitted a fatally-flawed application in December 2015 to cite a water extraction operation next to the Buckwha Creek.

Eldred's Zoning Officer at the time, Ellerslie "Bub" Helm, gave Nestle's application his seal of approval.  This first came in the form of a few sentences, which he didn't even bother to sign.  A month later, he wrote a paragraph in which he now stated there "might be an issue" with multiple uses, and signed it.  The township's engineer was paid over $10,000 (well spent, since "Bub" fucked up) to locate the serious and obvious issues with Nestle's plan that Helm missed.

Helm missed:
  • The fact that Nestle's operation would close a county-mapped through access road that existed on the property for 80+ years, to multiple land-locked parcels off-site.
  • That Nestle's proposal located bulk storage tanks in an area disallowed by the ordnance.
  • That Nestle's operation could not be co-located with the other uses on the proposed site and satisfy the zoning ordinance.
If Helm had flagged these issues, he would have issued a ruling that at least one variance was needed by Nestle.  This is critical, because Nestle could not prove the hardships needed to justify a variance.

Helm was sacked at the June 2016 Eldred BOS meeting.  This pathetic sack is rumored to have an interest in running for Eldred Township Supervisor.  He must be suffering from dementia or something.
Ellerslie "Bub" Helm at age 21

This blogger had the extreme displeasure to encounter or witness Helm on multiple occasions in his former official capacity.  The first time was in his office, when the request was made to inspect the Eldred zoning ordinance.  Although Helm had spent the previous 15 minutes shooting the breeze about how wonderful the walking trail on the old railroad bed is and it goes all the way to Little Gap (turns out the trail doesn't go all the way to Little Gap, and due to Helm's incompetence and lack of attention, the trial was heavily damaged by irresponsible tree harvesting at the Kunkletown Rod and Gun Club), he suddenly announced he was far too busy to hand me the zoning ordinance.

The Zoning Officer is the first line of defense when a business seeks to develop a site in town.  Helm informed me there was plenty of water on the site that Nestle was considering, and he had no problem with their proposal.  It was clear that when Nestle submitted a Site Plan, Helm would give it the green flag - which is not his job.

In nearby Plainfield Township, Zoning Officer John Lezoche similarly gave Synagro his gold seal approval in November 2016, when they applied to locate a human crap bakery in town.  Only when it was shoved in his face that Synagro needed not one but two use variances, did he reverse course and issue a new ruling that Synagro would need zoning relief.  Similar to Nestle, Synagro can't meet the criteria to achieve a use variance.  Cost to Eldred taxpayers to successfully fight off Nestle, since "Bub" fucked up?  $89,500.  Cost to Plainfield Township taxpayers?  $0, but only because people intervened and bitch-slapped the Zoning Officer.

Mr. Helm was useless.  Despite being asked numerous times to address annoying burning of trash, Helm shit the bed in his ordinance interpretation and enforcement.  First, he argued that the resident could burn egg cartons because they don't contain petroleum products (bullshit).  Next, he took glossy 8x10" date-stamped color photographs (at taxpayer expense) of the resident dumping paper, cardboard and plastic wrappers onto a fire, to "prove" they were not burning trash.  Only problem is, plastic wrappers are trash, and the county has an ordinance that states recyclables must be recycled county-wide.  So Helm proved the resident was breaking the law, but took the photos to prove they were abiding by it.

Dumb asses like this shouldn't be allowed to breathe the same air as the rest of us.  Helm will be doing competitors a favor by running - so they can bring up his performance as Zoning Officer.  Go ahead and run, Bub.

Tuesday, January 31, 2017

Synagro application for crap processing plant in Plainfield Township tabled until April


Apparently, no new application materials were received by Plainfield Township by today - the deadline for February's planning commission meeting.  Therefore, the only options that leaves are Synagro would attempt to move forward with an unworkable site plan (the one currently submitted but tabled), or it will remain tabled, grant an extension and not appear at the February meeting.

EDIT 2/1 3:30pm  Synagro has annouunced that it is tabling its application until the April planning commission meeting, and has extended deadlines for township rulings on planning and zoning matters until May 31, 2017.

This blogger's money is that Synagro is furiously working to attempt to relocate its proposed plant in the Solid Waste district, where it is a permitted use and multiple uses are allowed.  The same property as the land fill.  The challenge is, the land fill consumes virtually all the easily developed and accessed land in the SW district.  Also, the DEP may have to be solicited for its input, since a site chosen could be in an already DEP-permitted area for the land fill.  Stay tuned for more definitive information as it becomes available.

Wednesday, January 18, 2017

What to expect next in Synagro's application to locate a biosolids plant in Plainfield Township on Waste Management property

To understand how Synagro's application may move forward, we first must review how we got here.

Synagro files special exception application
Synagro's October 31, 2016 Site Plan application was for a special exception use in the Commercial Industrial zoning district.  A special exception is a permitted use that is given extra scrutiny and allowed reasonable conditions to be placed on an Applicant to protect the public health, safety and welfare.

Amended Zoning Officer review results in first use variance for multiple uses
The application was reviewed by the planning commission on November 21, and a few days later the Zoning Officer informed Synagro verbally that they needed a variance for multiple principal uses on a site that allows only one.  Synagro was given a few days relief from the normal deadline of 21 days prior to a planning commission meeting to submit new materials, and on December 5, 2016 an amended Site Plan application for a special exception was submitted, along with a variance application.

A special exception must be reviewed by both the planning commission and zoning hearing board.  Variances are also reviewed by both the planning commission and zoning hearing board.

Subsequent Zoning Officer review results in second use variance for non-permitted use
On December 15, 2016, the Zoning Officer issued a new ruling that Synagro needs a second variance, for a non-permitted use of Material Separation Facility.  A Material Separation Facility is permitted only in the Solid Waste zoning district, and for a 400 ton capacity the ordinance requires a 5 acre area.  This likely means that in the highly unlikely event Synagro obtains a variance to place a solid waste use in the commercial industrial district, Synagro's use would no longer be a special exception under the ordinance - it is now a permitted use, but not permitted where proposed.  Synagro would have to obtain a variance from the zoning hearing board for multiple uses AND a variance for a non-permitted use.  In their current Site Plan, the area defined is only 3.5 acres, so they would also require a third variance if no change is made that increases the area to the required 5 acres.

Synagro's application has been stalled since the determination Synagro's use is not permitted
Synagro tabled its application for the December and January planning commission meetings and is next expected to appear on February 21.  The deadline for filing new materials for February's meeting is January 31.

Synagro has submitted no new application materials since December 5, and it is not known how they plan to proceed.  During information sessions on January 9 and January 10, some attendees were told that Syangro is attempting to find a site within the Solid Waste district, where its use is permitted as are multiple uses.

Possibilities of how Synagro may proceed
Here are some options Synagro has:
  1. Continue to pursue the site depicted on current site plan, in the Commercial Industrial district
  2. Change to a site within the Solid Waste district
  3. Petition to expand the Solid Waste district, and develop a site in the expanded area
  4. Withdrawal application and walk away

For each of the numbered possibilities above, here are suboptions/observations:

1.) Continue to pursue current site
  • Proceed with the current Site Plan and one variance request that have been filed.
  • Submit a variance request for a non-permitted use, and proceed with the current Site Plan and current variance request.
  • Submit a new Site Plan with a 5 acre site defined, or submit a variance application due to not meeting the 5 acre requirement.
  • The probability of obtaining the two use variances needed is 0.  Variances are not precedential, so the variance issued in 2014 to add a gas pump to the property has no bearing on a new application.  Furthermore, there is a second variance for a non-permitted use - the most difficult variance there is, and no hardship to justify granting in this case.  Bullshit alert - this blogger was told by someone "Joe Schmo said this is a done deal, because there was a variance previously granted on this site."  Tell Joe he doesn't know WTF he's talking about, and you read it on a blog somewhere.  If this was a "done deal", Synagro would not have tabled its application in December and January.  Besides, they also need a second variance for a non-permitted use.  Come on, Joe, everyone has an ass - don't use it for talking because shit is coming out.
2.) Change to a site in the SW District
  • Submit a Site Plan for a location within the Solid Waste district, along with a variance request if a 5 acre area can not be found.
  • There are steep slopes on much of the undeveloped portions of the Solid Waste district.  A special exception is triggered if the target site is between a 15 and 20% slope, or within 100 feet of such a slope.
3.) Petition to expand the SW district and move to a site in the expanded area
  • The most obvious area of expansion, on the southeast portion of the existing district, is far away from the Green Knight Energy Center's waste heat source, a stream for wastewater, and natural gas as a backup heat source.
  • The probability of the Board of Supervisors approving expansion of the Solid Waste District is slim.
Looking over the possibilities, #1 is a dead end - there is no way in hell Synagro can justify these two variances.

#3, expansion of the Solid Waste district is highly unlikely.

That leaves #2 and #4.  Are Waste Management and Synagro going to walk away from what they believe is a perfect site for a human waste processing plant and big juicy profits?  Doubtful.  Waste Management can virtually go sky is the limit on rent - where else is Synagro going to find a place for this pile of crap?  This blogger's money is on door #2 - find a way to chisel a 5 acre site out of the Solid Waste district.  This is not as easy as it sounds, even with a site of 345 acres, because the dump covers much of the area.  The low lying area of this lot on the western edge is known as Grand Central Woods, and would present interesting environmental and drainage challenges if Synagro sets its sights there to locate its crap bakery.

Note that #2 may lead back to a special exception application, if steep slopes are involved.

A look at the SW district and lot outlines
In the left diagram below, the three lots that Waste Management owns are shown on top of the zoning map.  Synagro applied for use on E8 11 8, but their use in only permitted in the SW district.  Lot E8 12 1A is 4.35 acres and hosts the energy center, so the only possibility is to locate Synagro's plant on lot E8 12 1 - the parcel with the land fill.  It is important to note that Plainfield Township owns the old railroad bed that runs the entire length of the boundary of lots E8 11 8 and E8 12 1 and E8 12 1A.  There is a recorded agreement that until Waste Management "no longer needs use" of it, that the northern half of this right of way (where the Trail veers to the left in the diagram) may be used by Waste Management, including building improvements on it.

Note the diagonal lines - these denote an area of steep slopes.  The blue lines are water courses.  The lower right corner of lot E8 12 1 is currently zoned Farm and Forest (FF), and this is the location of the houses Waste Management has recently purchased.  The land is relatively flat here.  Could Synagro be planning to petition to change the zoning of this portion of lot E8 12 1 to Solid Waste?  Only time will tell.  There is probably a shit-flavored surprise of the month in store for Slate Belt residents.

Location of Waste Management's land fill-related parcels on zoning map

Here is the easement agreement that grants Waste Management to use a portion of Plainfield Township's property that separates lots E8 11 8 and E8 12 1 and E8 12 1A:



That's a lot of possibilities - when will we know something?
The day following the filing deadline for the Planning Commission is the best time to find out what has been filed for review the following month, and if the Applicant plans to appear.  The next filing deadline is January 31.  Note that Synagro may not be ready to do anything in February, and could table its application once again.